Centrifugal Gold Separating Machine

Discounts
Feed size:
 0~6mm
Processing capacity:
 0.25~30t/h
Product features:
 Sand gold mines, vein gold mines, polymetallic mines, Tailings recycling
Centrifugal Gold Separating Machine
60s
Manual response
30Min
Give technical reply
24h
Free customized solution
Hands-on guidance on factory construction
Special vehicle pick-up for factory visits
One-to-one after-sales service
Inspection of the production site nearby


Product Introduction

Centrifugal gold beneficiation machine is a new type of gravity beneficiation equipment that utilizes the principle of centrifugation, specifically designed to recover useful minerals from fine mud. Its emergence effectively solves the drawbacks of traditional gravity equipment, such as poor and even difficult separation of mineral mud.

产品工厂展示.webp

Product Advantages

High wealth ratio

The concentrate yield is only 0.02%~0.1%, and the grade has increased by 1000~3000 times

Energy conservation and environmental protection

No need for chemical agents, reducing water consumption by 30% to 40%, in line with green mining standards

Automated control

Supports PLC speed adjustment (600~2000r/min), easy to operate

Wear resistant design

The inner cone is made of stainless steel or polymer lining plate, with a lifespan of 3-5 years

优势.webp
优势.webp
优势.webp
优势.webp
客户案例.webp


Product Parameters
Model Processing Capacity (T/h) Backwash Water Consumption (m³/h) Slurry Water Consumption (m³/h) Feeding Concentration (%) Feeding Particle Size (mm) Concentrate Cleaning Cycle Weight of Concentrate Discharged Each Time (Kg) Power (Kw) Weight (Kg) Dimensions (mm)
STLB20 0-0.6 2-3 1.5-4 0-50 0-3 Every 1-3 hours for lode gold mines, every 2-6 hours for placer gold mines 2 0.75 205 914×700×900
STLB30 2-3 3-5 5-7 0-50 0-3 Every 1-3 hours for lode gold mines, every 2-6 hours for placer gold mines 3-5 1.5 380 1160×885×1165
STLB60 8-12 7-10 8-12 0-50 0-5 Every 1-3 hours for lode gold mines, every 2-6 hours for placer gold mines 10-20 4 1100 1820×1450×1700
STLB80 40-45 30-36 40-45 0-50 0-5 Every 1-3 hours for lode gold mines, every 2-6 hours for placer gold mines 40-50 11 2300 2476×2032×2018
STLB100 60-80 50-60 60-80 0-50 0-6 Every 1-3 hours for lode gold mines, every 2-6 hours for placer gold mines 70-80 18.5 3700 2849×2085×2426

Contact Us

Do you need to know the product price? Model? Configuration plan? Output?
Please leave your correct information and we will reply to you within 24 hours.

Customer Service

Copyright © Henan ZOOMJO MINING Machinery Co., Ltd. All Rights Reserved.

Chat Online
Message
Email: sales-zjks@zoomjo.cn
WhatsApp: +86-13938216895

Wechat